Tennis-to-Pickleball Conversion

Convert Your Tennis Court to Pickleball

Underused tennis court? Turn it into a busy pickleball facility — for a fraction of a new build, in a fraction of the time. Serving Baton Rouge, New Orleans, Lafayette, and across  Louisiana.

Tennis Demand is Down. Pickleball Demand is Booming.

If your tennis court sits empty most weekends, you’re sitting on prime pickleball real estate — and converting it is one of the fastest, cheapest ways to add the country’s fastest-growing sport to your property.

A standard tennis court is large enough to host up to four full pickleball courts with overlay striping, or one regulation pickleball court with re-striping. Want to compare against a ground-up build? See our backyard pickleball court guide for new-build planning.

Below: the math, the three conversion paths, and the answers to the questions tennis court owners actually ask. For full pricing context, see our Louisiana cost factors guide.

The Conversion Math

One Tennis Court = Up to Four Pickleball Courts

A regulation tennis court is 60×120 ft. A pickleball court is 20×44 ft — small enough that four of them fit comfortably inside one tennis footprint with safe runoff between courts. See full pickleball dimensions in our backyard guide.

🎾

1

Tennis Court

=

Up to 4

Pickleball Courts

Tennis court: 60×120 ft (7,200 sq ft)  ·  Pickleball court: 20×44 ft play surface (30×60 fenced for safety)
Four full pickleball courts fit within a standard tennis footprint with room for safe run-off — or convert to a single dedicated pickleball court at regulation size.

Fastest, Most Affordable Pickleball lines painted on existing court surface by Goals & Poles

Option 1: Re-Stripe Only

If your existing tennis court surface is in good shape, the fastest and most affordable conversion is to paint pickleball lines directly on top of the tennis striping. The tennis net stays (or comes down), pickleball nets go up, and you're playing within days.

Days From Quote to Play
  • Use Existing Surface
  • Up to 4 Courts From 1
  • Lowest Investment
  • Keep Tennis Lines (Combo)
Get a Quote for Re-Stripe →

Or compare all surface options →

Refresh + Pickleball Resurfaced and re-striped pickleball court installation by Goals & Poles

Option 2: Resurface + Re-Stripe

When the existing tennis court has worn paint, surface cracks, or faded color, we resurface it with fresh acrylic before applying the new pickleball striping. You get a fresh court life (10+ years) plus pickleball functionality — without the cost or timeline of a full rebuild.

1–2 Week Timeline
  • Fresh Acrylic Surface
  • New Color Options
  • Extended Court Life
  • Multi-Sport Layout Possible
Get a Quote for Resurface →

Learn more about resurfacing →

Built for Pickleball Premium acrylic-on-concrete pickleball court built by Goals & Poles

Option 3: Full Rebuild as Pickleball

If the tennis court foundation is compromised — major cracks, drainage failure, settling — the best path is a full demo and rebuild as a dedicated pickleball facility. You get a fresh foundation, tournament-grade acrylic, custom colors, and the longest lifespan available.

15–25 Year Lifespan
  • Brand-New Foundation
  • Tournament-Grade Surface
  • 31+ Custom Colors
  • 15–25 Year Lifespan
Get a Quote for Full Rebuild →

See premium surface options →

Why Convert

Three Reasons HOAs, Schools, and Homeowners Are Converting

Pickleball is the fastest-growing sport in America for the third year running — and the supply of dedicated pickleball courts hasn’t kept up with demand. For HOAs, schools, and homeowners with an underused tennis court, conversion is the fastest way to meet that demand without the cost or timeline of a new build.

Court Capacity

One tennis court footprint can serve up to four pickleball games simultaneously — multiplying your court capacity for tournaments, leagues, or open play.

40-60%

Cost Savings

Conversion is typically 40–60% less than a full new pickleball build when the tennis court surface is in good condition.

Days

To First Game

A re-stripe conversion can be done in days. Resurface + restripe runs 1–2 weeks. Even a full rebuild is faster than a brand-new site build.

Conversion FAQs

The questions tennis court owners ask before they convert.

Up to four full pickleball courts fit within a standard tennis court footprint (60×120 ft / 7,200 sq ft). With overlay striping, you can paint four 20×44 ft pickleball courts onto a single tennis court while leaving the tennis lines intact for combo play. For dedicated pickleball use, one tennis court easily converts to a single regulation pickleball court at full size with room for run-off. For full court dimensions and layout planning, see our backyard pickleball court guide.

Yes — many homeowners and facilities keep both. We paint the pickleball lines in a contrasting color (typically yellow or blue) so they’re clearly distinguishable from the white tennis lines. This is the most flexible option if you want to keep playing both sports on the same court.

A re-stripe conversion takes days — usually 1-2 days from contract to play. Resurfacing plus re-striping takes 1–2 weeks. A full demo-and-rebuild as a dedicated pickleball facility runs 2-4 weeks, similar to a new build. Timeline varies significantly by surface choice — painted lines fastest, full acrylic-on-concrete longest.

Conversion cost depends on the path. Re-stripe only (existing surface, just paint new lines) is the most affordable — a fraction of a full new build. Resurface + re-stripe is mid-range. Full demo-and-rebuild approaches the cost of a new build but on an existing foundation. For a custom quote on your site, request a free quote — or see our cost factors guide for what drives the number.

No — the tennis net stays in place if you want to keep both sports playable. For pickleball play, the tennis net is too tall (36 inches at center for tennis vs. 34 inches for pickleball), so most setups use portable pickleball nets that go up over the tennis surface. For dedicated pickleball-only conversion, the tennis net is removed and pickleball net posts are installed. For full net specs and court setup, see our backyard pickleball court guide.

For re-stripe only, you keep the existing surface — whatever the tennis court is currently surfaced with. For resurface + re-stripe, we typically apply fresh acrylic (tournament-grade) over the existing concrete. For a full rebuild, you get to choose: painted concrete, modular tile, or acrylic-on-concrete — each has different cost, lifespan, and feel.

Most HOAs that approve a tennis court will approve a pickleball conversion — the court footprint and infrastructure are essentially unchanged. Some HOAs may require approval for changes to the surface color or net setup. We can help you put together the documentation HOAs typically request (project scope, surface details, before/after visual). Permitting is generally minimal for a re-stripe conversion. For more on HOA and permit considerations, see our backyard pickleball court guide or contact us to discuss your HOA’s requirements.

13,000+ courts. 40+ years. One free quote.

Ready to Convert Your Tennis Court?

Tell us about your existing court and how you want to use it. We’ll come back with a recommended path and a custom quote in 1–2 business days.